Tokens per second.
Report the tested model, context, precision, batching and concurrency. Input processing and output generation are not interchangeable.
Project Vela / Compute infrastructure
Infinite Sunlight. Effortless Intelligence.
Our mission is to make useful intelligence accessible to everyone through practical engineering.
We measure success by how efficiently we execute existing AI models and deliver their output. We are developing the infrastructure, while model creators and users determine what that output accomplishes. Vela’s distributed architecture is designed to maximize token throughput per unit of sunlight, launched mass, and deployed cost.
See the evidence Discuss technical fit →Chip throughput and accuracy have been measured on the bench. V1 compute capacity is projected from lab measurements; system efficiency remains to be measured. V2 and V3 are design targets. No orbital compute service is offered today and no flight is committed.
Benchmark / Updated Nov 2026
Our V1 compute projection is grounded in lab measurements. V2 and V3 remain design targets.
V1 / Measurement-based projection
* Qwen2.5-7B feed-forward compute projection from batched lab measurements; excludes attention and system overhead. Not measured output generation.
| Generation | Status | Design target: tokens/s per solar electrical watt |
|---|---|---|
| V2 | In development · design target | 200–370 |
| V3 | In design · design target | 650–1,300 |
Solar watts mean electrical power from the cells, not incident sunlight. Projection basis and historical comparisons →
V1 is intended to validate the system. V2 and V3 target efficiency gains. Whole-system measurements are still in progress.
How we get there, and why we believe it → · Read the paper →
Design target / One launch
~5 billion tokens per second processed* on a 7–8B-class model, in sunlight
≈ 100,000 H100 GPUs in the historical source-derived calculation; not an established matched-workload comparison
~75 kW per satellite; ~4–5 MW per Starship launch today, ~6 MW with our next-generation panels (~25,000 m² of panel at ~240 W/m², in sunlight, for the ~6 MW next-generation-panel case)
80 satellites per 100-tonne Starship launch
* Design target for purpose-built silicon, not a measurement. “Processed” counts input and output tokens together under an input-heavy reference scenario; that scenario is a reference point, not a chosen operating split. Output generation costs more per token, so the total depends on the input/output mix. Power basis: electrical power delivered by the solar cells, in sunlight—not incident sunlight.
Separately, a calculated projection of about a billion tokens per second per launch applies energy per operation measured while a chip ran an image model to a 7–8B-class language model. It is distinct from the language-model bench results, which measured accuracy and layer throughput, not energy per token. Language-model energy measurements are under way. Our purpose-built silicon targets five billion processed; neither figure is delivered launch capacity.
~3.8 kW per panel (nameplate), about 3 kW in orbit
4.35 × 2.40 m, made of tiles that each carry their own solar cell and compute
Spare tiles built in, so a failed tile is switched out, not repaired
Third-generation design target. Not yet built or flown. Why we believe it → · Read the paper →
Figures in the Benchmark and Launch sections for V2 and V3 are design targets. V1's per-watt figure is calculated from chip speed measured on our bench. Bench results distinguish measurements from test limits.
Earlier project overview
This earlier overview video predates the current infrastructure-only positioning. The written scope and readiness disclosures on this site are current.
How we evaluate performance
Model creators and users determine what the output accomplishes. Vela evaluates the infrastructure that executes the model.
Report the tested model, context, precision, batching and concurrency. Input processing and output generation are not interchangeable.
State whether power covers a chip, module or complete system. Calculated solar-panel performance is not a whole-system measurement.
Check that execution preserves the stated model baseline within the reported test limits. Do not infer application success from token counts.
Maximize token throughput per unit of sunlight, launched mass and deployed cost. Mass and cost efficiency are design objectives, not demonstrated commercial results.
Token counts are not universally comparable across models, tokenizers, contexts or precision. Latency is reported only when measured. See current bench evidence; supported configurations are still being validated.
The opportunity
Our scope is infrastructure for applicable existing-model workloads—not agent software, application development or the value of customer outcomes.
The commercial opportunity depends on model compatibility, energy efficiency, utilization, communications capacity and customer adoption. We do not treat total AI or cloud spending as Vela’s addressable market. Investor overview →
Design envelope / Not shipped
Panel envelope: ~40 kg and ~3.8 kW per panel (nameplate), about 3 kW in orbit. The headline launch calculations assume a 7–8B-class language model; that class is not yet validated on the current bench.
These are design assumptions, not supported-service specifications. Earlier accepted-task and accepted-step metrics have been retired; their numerical estimates are not token estimates. See current evidence.
01 / Orbital compute research
One modular architecture, from a single solar-compute tile to a full spacecraft.
Physical systems
Concept & engineering studies
Vela’s orbital design integrates distributed inference compute with the solar array. Capacity is designed to scale through modular panels, with passive heat rejection.
Existing models, not new AI applications. We are developing the execution infrastructure. Model creators and users determine what model output accomplishes. Model compatibility and larger-model performance remain under validation.
Development status. V1 uses off-the-shelf parts for bench validation. V2 and V3 are design targets. No orbital compute service operates today.
Public information is capability-level. Detailed engineering is shared with researchers, partners and investors under NDA: info@project-vela.com.
Current objective
Our first spacecraft objective: a proposed demonstrator built from the same panel architecture and sized for a SpaceX Falcon 9 rideshare launch. Not yet committed.
Current objective / Falcon 9 rideshare
Demonstrate solar-powered inference in orbit with flight hardware from the same architecture that later spacecraft will use.
What it should show
Power, thermal behavior, data links and model execution measured on a real spacecraft, not just on paper.
Future work
Larger multi-panel spacecraft concepts that build on Vela-Scout 83 results. Specifications will follow validation.
Spacecraft-level projections will be published as they are baselined. Figures elsewhere on this site are design targets. The Bench results section distinguishes measurements from test limits.
Exploratory
Early exploration · future work
Alongside Vela, we are exploring new system and software architectures that could make inference more efficient wherever it runs. This work is early and exploratory; it is not a product and makes no performance claims.
Bench log
Measured · 16 November 2026
Key results from the technical memo Doing More With Less: Symbiotic Compute Beyond Computer Vision. Figures below are measured unless noted. The bench log below uses the same figures.
40 accelerator chips streamed at full rate for 10 minutes (8,482 fps, peak 66 °C). All 5,089,557 outputs matched their references bit for bit.
Perplexity within about 1% of full precision at 0.5B, 1.5B, 3B and 7B, with part of each model on the accelerators (see the full log for each result).
1,607 answer tokens a second with 2,048 concurrent agent sessions and no errors (0.5B test model, 40 chips, desktop host).
Full bench log and architecture →
Calculated, not measured
Calculated panel scenarios (input processing). About 105,000 tokens per second at 3B class, or about 46,000 at 7–8B class, per ~3.8 kW (nameplate) panel. Calculated from layer throughput measured on our bench—not measured on a panel. Assumes accelerator power fits the panel budget, the controller keeps pace and work stays fully batched; none of these is yet verified. These panel scenarios cover input processing only; they are not measured end-to-end serving rates.
Complete the Node 1 nowcast run after the first 2,000 sequences and investigate the write timeout; add inline Arm host plus third-slot supply metering (Stage 4). Multi-season and live radar validation remain ahead.
Want the details? We share architecture and test data with researchers, partners and investors under NDA. Email us →
Where we are
Figures on this page are design targets and will be updated as modeling and testing progress. The Bench results section distinguishes measurements from test limits.
Gen‑3 panel design iteration underway, with more iterations expected. Now: bill of materials, panel simulation and bench tests of key parts.
Build and measure tiles and a tile group on the ground: power, heat, cold survival, data links and token throughput.
A proposed SpaceX Falcon 9 rideshare demonstrator and our current objective. Not yet committed.
Public milestones
Read the dated publication record and scoped development milestones on Updates →. Planned validation and the proposed flight remain separate from achieved milestones.
Contact
For technical fit, prospective compute workloads, partnerships or press, email info@project-vela.com. No production service is offered today.
For investment inquiries, see Investor Relations. Builders and prospective business partners: Careers. Background: About · Press kit.
Our approach
Progress means replacing assumptions with evidence, one experiment at a time.
Select an existing model and test configuration; specify throughput, energy and fidelity checks against a baseline.
Include memory, power, data movement, and recovery costs. Compare against a credible baseline.
Keep what demonstrates value. Revise or stop approaches that do not survive testing.
Current stage Preliminary engineering and research design. Panel design is at its third generation (Gen‑3); bench validation is in progress; whole-system validation remains ahead.
No. Project Vela is an early-stage research and engineering initiative. It has not demonstrated an operating orbital compute service. Vela-Scout 83 is proposed as a rideshare demonstrator, but no flight is committed.
Vela is developing infrastructure for inference rather than training. For V1 Pathfinder bench work we use commercial edge AI accelerators and an Arm host (six-core Cortex-A55). Attention graph layouts, weight preparation, multi-chip orchestration, and panel architecture details remain proprietary and are shared under NDA. Silicon, manufacturing and deployment assumptions require validation; no flight-qualified system is claimed.