Infrastructure for executing existing AI models—not model or application development. Model creators and users determine what the output accomplishes.
Our design target is about 5 billion tokens per second processed* from one 100-tonne Starship launch, on a 7–8B-class language model, in sunlight. Our purpose-built silicon and full-scale orbital system remain design targets.
* Design target for purpose-built silicon, not a measurement. “Processed” counts input and output tokens together under an input-heavy reference scenario; that scenario is a reference point, not a chosen operating split. Output generation costs more per token, so the total depends on the input/output mix. Power basis: electrical power delivered by the solar cells, in sunlight—not incident sunlight.
A separate ~1 billion tokens-per-second figure is a calculated projection from energy per operation measured while a chip ran an image model; it is distinct from our language-model bench results.
The design combines distributed inference, solar power and passive heat rejection. Manufacturing, deployment and whole-system efficiency require validation; no flight-qualified system is claimed.
Four reasons the numbers work
1. In orbit, power is the free resource.
Above the atmosphere, sunlight delivers about 1,361 watts per square metre. In the right orbit, it shines nearly all the time. On the ground, AI is limited by how much grid power a site can get. In orbit, the limit is how much panel you launch, and silicon solar cells are among the most mass-produced things on Earth: the world makes hundreds of gigawatts of them a year. One launch needs a tiny fraction of that.
2. Efficient distributed execution.
Efficient distributed execution. Energy efficiency depends on the complete inference system, not arithmetic alone. Vela is developing a novel distributed architecture to execute existing models. Its efficiency targets remain subject to hardware and whole-system validation.
3. Passive thermal design.
Passive heat rejection is a design objective. Thermal performance and environmental durability require validation; no flight-qualified system is claimed.
4. Manufacturing and deployment validation.
Manufacturing and deployment require validation; no flight-qualified system is claimed.
The path: three generations
V1 / Measurement-based projection
~50 token positions/s per accelerator chip*
* Qwen2.5-7B feed-forward compute projection from batched lab measurements; excludes attention and system overhead. Not measured output generation.
Unit convention: “tok/W” in the calculation tables means tokens per second per watt (tokens per joule). Solar watts are electrical power delivered by the solar cells, not incident sunlight. Reading context and generating output have different costs; all comparisons depend on the stated model and workload assumptions.
V1 is intended to validate the system: real models, real accuracy, real power, built from parts anyone can buy. Its compute projection is based on measured layer throughput, not established matched-workload GPU parity. Our bench is now measuring a whole system to confirm it.
V2: purpose-built silicon. Improved efficiency for executing existing models is a design target, subject to hardware and whole-system validation.
V3: the panel itself becomes the computer. Panel integration and efficiency are design targets that require validation.
One launch, rung by rung
Separately, a calculated projection of about a billion tokens per second per launch applies energy per operation measured while a chip ran an image model to a 7–8B-class language model. It is distinct from the language-model bench results, which measured accuracy and layer throughput, not energy per token. Language-model energy measurements are under way. Our purpose-built silicon targets five billion processed; neither figure is delivered launch capacity.
Rung
Per launch
Basis
At measured shipping-chip efficiency
~0.9B tok/s
6 MW (next-generation panels) × ~150 tok/W in sunlight — shipping low-power silicon measured on our bench (vision workload), projected to a 7–8B LLM
Custom chip at published ratings (V2 target)
1.2–2.2B tok/s
6 MW (next-generation panels) × 200–370 tok/W in sunlight — published chip ratings assuming high utilization (not yet shown)
Purpose-built panel silicon (V3 target)
~5 billion tok/s
6 MW (next-generation panels) × ~850 tok/W in sunlight (V3 design target; the 650–1,300 band depends on workload and utilization assumptions)
Even if we're wrong by 100×
The V1 calculation works out to tens of millions of tokens per second per launch under the published assumptions. This is a design proposal, not demonstrated orbital capacity. System performance, communications, environmental durability and operational infrastructure remain to be validated, even without the targeted V2 and V3 efficiency gains.
What still has to be proven
We'd rather say this plainly:
Custom-chip efficiency on real language models. Datasheet figures overstate what chips deliver. Measurements, calculations and design targets are reported separately.
High chip utilization on language models. Off-the-shelf chips deliver only a fraction of their rated throughput on language models; our V2 and V3 targets assume high utilization, which is the first claim to prove.
Input-reading vs. answer-writing mix. The ~850 tok/W figure assumes workloads weighted toward reading context; generating output tokens alone runs lower depending on memory design.
Building the third-generation panel at high yield. Each manufacturing step exists in volume today; combining them at panel scale hasn't been done yet.
Solar cell output over years in orbit, at operating temperature. We plan with conservative, published space-agency figures.
Launch at full rated payload. Our figures are per 100-tonne launch, Starship's rated capacity. Flights so far have carried less.
Ground links and customers at this scale.
Each item has a test or a study behind it.
Measured vs. target
Our bench results are measured; panel scenarios derived from them are calculated. V1 compute capacity is projected from batched layer measurements; historical solar-watt and GPU calculations are retained in the paper, not current matched-workload results. V2 and V3 figures are design targets. The billion-token figure uses energy per operation measured on our bench on an image model, applied to a 7–8B-class language model; language-model measurements are under way. Not yet built or flown.
Want the engineering? We share architecture, test data and the full physics and manufacturing case with researchers, partners and investors under NDA. Email us →