Architecture / Patent pending · Updated Nov 2026
Tech spec: how a Vela panel is put together
A Vela panel is a solar array that is also a computer. Every tile makes its own power, sheds its own heat and carries its own AI accelerators. Here is how the pieces fit, what our first version (V1) is built to show, and what we have measured so far.
Architecture patent pending (US provisional applications filed October and November 2026). The V1 figures below are the baseline for our first build and will change as testing continues. Results marked Measured were measured on our development bench; items marked Goal are design targets.
The building blocks
Vela is built in layers, each made of copies of the one below. Every level has one job, and only small messages travel between them.
| Level | What it is | V1 baseline |
|---|---|---|
| Accelerator | A small, low-power AI chip that keeps its share of the model's weights on the chip itself. No external memory for weights. | Commercial accelerators |
| Tile | One solar cell with its own power converter, heat spreader and electronics. The tile is its own radiator. | One standard solar cell; compute power matched to the cell |
| Node | A hub tile with a small host computer, driving one chain of accelerators across its neighbouring compute tiles. | One hub tile plus several compute tiles |
| Hub cluster | Nodes mirrored so their hub tiles meet in the middle, a few centimetres apart. | Several nodes |
| Panel | Clusters in bands, a services column with two gateways, folding along its long edges. | Dozens of clusters; size set by the launch envelope |
| Spacecraft | Many panels on deployable wings around a small core. | Sized per launch (see Technology) |
One node
A node is a hub tile and its neighbouring compute tiles. The hub tile holds a small host computer; the compute tiles hold the accelerators. The accelerators form one chain that steps from tile to tile, driven by the host. Each tile still runs on its own cell, so only data crosses the tile edges.
One node. The hub drives one accelerator chain through its compute tiles.
Hub clusters and the panel
Nodes are mirrored so their hub tiles meet at the centre of a block of tiles. The hubs of a cluster are a few centimetres apart, so the busiest connections stay short. Clusters line up in bands; the hub tiles of each band form a trunk row that carries traffic along the panel. Two gateways at one end connect the panel to the spacecraft, and the middle trunk row reaches both, so losing one gateway doesn't cut off a band.
One hub cluster: nodes mirrored so their hubs meet in the middle.
Why clusters?
Hubs that sit together can talk over very short links. Neighbouring parts of a model go in the same cluster, and only small messages travel between clusters.
Every panel carries spare nodes, enough to cover the loss of a whole cluster, so a failure means moving work to a spare, not a repair.
An example panel. Hub tiles are gold; the gold lines are trunk rows. The panel size is set by the launch envelope and will change.
Design rules
- No batteries for compute.The panel computes in sunlight and rests in Earth's shadow.
- No heaters.Tiles are built to survive the orbit's temperature swings bonded to their cells.
- Heat leaves where it is made.Every tile radiates its own heat. No pumped loops and no separate radiators.
- Power stays local.In V1 each tile runs on its own cell. Only data crosses tile edges and fold lines.
- Nodes talk host to host.Accelerator chains stay inside their node; nodes exchange small messages over standard network links.
- Nothing moves after deployment.One unfold, then the panel is solid-state.
- Spares, not repairs.A failed node's work moves to a spare node, which reloads from its own storage.
- Inference only.Vela runs existing AI models. It is not designed for training.
Three generations
The building blocks stay the same from generation to generation; what changes is how much of each block lives on one chip.
| Generation | Electronics | Purpose |
|---|---|---|
| V1 | Off-the-shelf parts: a small host computer and commercial AI accelerators on each node. | Prove the whole system works, first on the bench, then in orbit. |
| V2 | One custom controller chip per hub, replacing the off-the-shelf host. | Cut the power that doesn't make tokens. |
| V3 | One chip per tile that holds the links, the weights, the attention and the memory, bonded to the panel. | The panel becomes the computer. |
Efficiency targets for each generation are on the Technology page.
V1 goals
- GoalRun every piece of a node on the bench: the host, the accelerator chain, the links between nodes and the software.
- GoalSend at least about 75% of each node's power to the accelerators, not to support electronics.
- GoalServe short, specialized agent jobs whose answers can be checked automatically. Throughput over latency.
- GoalMeasure what customers pay for: cost per correctly finished job, not raw tokens.
- GoalMatch full-precision accuracy on real tasks within a small margin.
Bench results
Measured · 16 November 2026
New measured highlights
Key results from the technical memo Doing More With Less: Symbiotic Compute Beyond Computer Vision. Figures below are measured unless noted. The bench log below uses the same figures.
- 40-chip, 10-minute soak: 8,482 fps, 5,089,557 bit-exact outputs (peak 66 °C).
- Attention OCR on Node 1: 745 → 10,345 pages/hour.
- 40-chip Qwen2.5-0.5B: 1,607 tok/s across 2,048 sessions.
- Standard nowcast on bench accelerator chips (12,159 sequences, with the calibration table): within +0.53% pixel error and +0.07 heavy-rain points of full precision; 16 km six-level skill 0.482 vs 0.475.
- Node 1 nowcast: first 2,000 sequences byte-identical to the bench chips; 46.8 forecasts/s at ~0.34 J each (single measurement), ~27× below Earthformer GPU-only energy (9.3 J).
- Host triage: −70% national-cycle energy (18.21 J → 5.45 J on the metered stand).
Measured40 chips, 10 minutes, every output exact
40 accelerator chips streamed at full rate together for 10 minutes (8,482 fps, peak 66 °C). All 5,089,557 outputs matched their references bit for bit, and throughput rose one-for-one as accelerators were added.
ScopeA streaming and stability test, not a language-model serving test.
MeasuredA chat model on the accelerators
A 0.5B-parameter chat model generated answers with the weights of all 24 transformer layers on the accelerators. It chose the same next word as an 8-bit reference 96.6% of the time, with perplexity up 1.0%, and held 16 conversations at once with no crosstalk.
ScopeThe host computer ran the model's remaining parts. 0.5B is a test model, not a product.
MeasuredAccuracy through 7B, samples at 72B
Complete 0.5B, 1.5B, 3B and 7B language models were evaluated with part of each model on the accelerators and the rest on a host computer at full precision. Perplexity rose by +0.79% to +0.85% (0.5B), +0.77% (1.5B), +0.54% to +0.96% (3B, by configuration) and +0.55% (7B, all feed-forward layers on the accelerators). At 72B, sampled layers on the accelerators matched full-precision outputs closely (similarity above 0.9999).
ScopePerplexity on fixed evaluation text, not task accuracy and not serving speed. 72B: the first two of its 80 layers only; no whole-model 72B result yet.
MeasuredMany agents at once
1,607 answer tokens a second with 2,048 concurrent agent sessions and no errors. Answers were identical whether 32 or 1,024 sessions were running. A fixed set of 1,800 agent tasks finished within 0.89 points of full precision (0.33 with retry).
Scope0.5B test model (Qwen2.5-0.5B-Instruct) on 40 accelerator chips and one desktop host. The host software is the limit and is still improving. Power was not measured in this agent-throughput test.
MeasuredA 4.5-hour agent soak
211,500 agent jobs over 4.5 hours with no failed requests. Repeated passes over the same jobs returned identical answers, and memory use stayed flat.
Scope0.5B test model on the desktop bench. Measures completion and repeatability, not task accuracy.
MeasuredPower on the Node 1 stand
Node 1 nowcast energy was metered on the 12 V carrier stand: 46.8 forecasts/s at ~0.34 J each (single measurement, first 1,000-sequence chunk), ~27× below Earthformer’s 9.3 J GPU-only energy. Host triage cut national-cycle stand energy from 18.21 J to 5.45 J (−70%). RTX 5080 comparison figures are GPU board power only.
ScopeStand metering of the 12 V carrier. Inline Arm host plus third-slot supply metering is still next (memo Stage 4). The 46.8 forecasts/s and ~0.34 J figures are a single first-chunk measurement, not a completed multi-round rate. Some per-watt figures elsewhere on this site remain calculated from measured chip speed, not measured at the wall.
MeasuredNode 1 on the bench
Vela Node 1 — an Arm host (six-core Cortex-A55) with 12 accelerator chips — ran attention OCR, host triage, and the first 2,000 nowcast sequences, which matched the 40-chip bench forecasts byte for byte. The nowcast run then stopped on the second 1,000-sequence chunk after an accelerator write timeout; PCIe flags, temperatures, and post-run goldens were clean.
ScopeThe best unproven guess for the stop is SD-card contention while writing the next 1.9 GB input chunk. Completing the remaining sequences is still ahead.
MeasuredAttention OCR on Node 1
Moving an attention-based text reader from Arm cores to Node 1’s 12 accelerator chips raised steady receipt throughput from 745 to 10,345 pages/hour. With an upgraded on-chip detector and field picker, end-to-end field accuracy reached 77.4% at 9,679 pages/hour, or 80.5% at 6,872 pages/hour with host spell-checking.
ScopeNode 1 document-processing result from the technical memo. Document jobs at 3B and 7B were not part of this measurement.
MeasuredSatellite image and cloud screening
Overhead ship detection scored 0.955 mAP50 on ships. 16-bit pre-downlink cloud screening scored 93.2% versus 94.1% at full precision.
ScopeFigures as reported in the technical memo. The chips match full-precision baselines on these tasks.
What's next
- Node 1 nowcast run, completed. Finish the remaining sequences after the first 2,000 and investigate the accelerator write timeout (best unproven guess: SD-card contention while writing the next 1.9 GB input chunk).
- Multi-season and live radar validation. Triage filters were scored on 20 held-out Spring 2019 days; multi-season validation and live radar feeds are still ahead.
- Inline power metering. Node 1 stand metering is measured; inline Arm host plus third-slot supply metering is still next (memo Stage 4).
Want the details? We share architecture and test data with researchers, partners and investors under NDA. Email us →