Achieved publication and bench milestones. Dates identify publication, not the date a test was performed, unless expressly stated.
· Technical memo published
Symbiotic compute memo published
A technical memo, Doing More With Less: Symbiotic Compute Beyond Computer Vision, reports measured results from the 40-chip desktop bench and Vela Node 1: bit-exact scaling, attention OCR, multi-chip language agents, and a symbiotic storm-triage and nowcasting case study. These are bench and Node 1 measurements, not an operating orbital service.
The public paper’s revision dated 5 November added an explicit calculation ladder and workload qualifications. This improves the distinction between evidence, calculations and targets; publication does not validate the targets.
Public bench findings reported model-fidelity checks on development hardware. These are limited bench results, not validation of larger models, complete-system energy efficiency or orbital performance.
The project made an initial public overview and development-hardware findings available. This established a public evidence record, not an operating service.
October’s public record also noted a panel-design iteration; this was design progress, not hardware validation. November’s earlier site published outcome-based KPIs, panel targets and a power-demand scenario. Outcome-based metrics have since been superseded by the infrastructure-only scope. Their numerical estimates have not been relabeled as token estimates.
Plans are not milestones
Whole-system measurement and further ground validation remain work in progress. Vela-Scout 83 is proposed, with no flight committed. See the roadmap for planned work and Investor Relations for risks and context.